|
Place of Origin | china |
Brand Name | filter |
Model Number | FLT-FB-268 |
High Efficiency 550GSM Nomex /Aramid Dust Filter Bag in Steel Industry:
Description:
Technical Specification:
Fiber Composition
|
Polyester
|
Polyester (PET) with PTFE membrane
|
PTFE
|
|
PPS
|
Nomex
|
Weight (g/m2)
|
500
|
500
|
750-800
|
500
|
500-550
|
450-600
|
Thickness (mm)
|
1.7-2.0
|
1.7-2.0
|
1.2-1.6
|
2.1
|
1.8-2.0
|
1.9-2.4
|
Running Temperature (°C)
|
130
|
130
|
240
|
180
|
160
|
200
|
Peak Temperature (°C)
|
150
|
150
|
260
|
260
|
190
|
240
|
Air Permeability
(M3/M2.S. 200Pa) |
8-12
|
8-12
|
5-8
|
14
|
15
|
8-12
|
Mechanical Finish
|
Singeing, calendaring, heat-set
|
Singeing,calendaring
|
Heat-set and Singed one side
|
Singeing
|
Singring
coating
Heat-set
|
Singeing
|
Chemical Finish
|
membrane
|
PTFE/PTFE
coated
anti-static
Water and oil repellent
|
PTFE impregnated peritoneal
|
|
|
PTFE coating, membrane
|
Warp Of Stretch Strength
|
800
|
1000
|
600
|
900
|
900
|
900
|
Welf Of Stretch Strength
|
1200
|
1300
|
800
|
1200
|
1200
|
1200
|
Resistance to Acid
|
Medial
|
Fair
|
Excellent
|
Excellen
|
Excellent
|
Fair
|
Resistance to Oxidation
|
Excellent
|
Good
|
Excellent
|
Excellent
|
Poor
|
Fair
|
Resistance to Alkali
|
Medial
|
Poor
|
Excellent
|
Excellent
|
Excellent
|
Good
|
Resistance to Hydrolysis
|
Medial
|
Poor
|
Excellent
|
Excellent
|
Excellent
|
Fair
|
Application
|
1) The fume and smoke treatment and particle removing system in metallurgy plant
2) Smoke filtration in garbage burning, coal-feed boiler,power plant3) Asphalt concrete mixture, cements, chemical,ceramics, building materials 4) Dust treatment, purification and collection in electronics, mining, flour and timber processing
|
|||||
Size
|
Φ4'' ; 5'' ; 5.25'' 6'' ; 6.62'' Length: 18'' up to 192''
|
|||||
Filter Bag Top Construction
|
1) Side Load: raw edge top (3” longer than split collar cage length)
2) Top Load: snap band/ring ; double beaded |
|||||
Bottom Construction
|
1) Single-ply felted disc bottom
2) 3” bottom; double-ply wearguard
3) 5” wear cuff with 2” overhang below bag disc bottomBottom Construction
|
There is normal size as following :
Applied industry ( Bag Filter system ) | Diameter (mm ) | Length (mm) |
Asphalt mixing Plant | 130 | 2500 |
Metal smelting furnace | 160 | 3000 |
Steel Mill ( sintering machine , blast furanmce ) | 160 | 6000 |
Tobacco drying system | 130 | 3600 |
Aluminum / leads scrap melting furnace | 160 | 3600 |
Producing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:
Exhibization:
Customer Visit:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) |
||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |
FAQ:
Q1. What is your terms of payment?
A: T/T will usually be accepted,details could be negotiated.
Q2. What is your terms of delivery?
A: FOB, CFR, CIF, DAP, FCA, EXW
Q3. How about your delivery time?
A: Generally, it will take 10to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q5. What is your sample policy?
A: We could offer the sample for free charge but do not pay the cost of freight.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
A:2. We respect every customer as our friend and we sincerely do business and make friends with them.
Generally, It will take 10 to 20 days after receiving your advanced payment. The specific delivery time depends on your items and quantity of your order.
Contact Us at Any Time