Nonwoven needle felt Aramid felt filter cloth NOMEX dust filter bag:
Production Features:
1. Various material: Polyester(PE), Polypropylen(PP), Aramid, P84, Acrylic, PPS, Fiberglass, PTFE,Nomex,FMS etc.
2. Strong intensity.
3. Excellent anti-abrasion,good finishing treatment.
4. Good raw material, competitive price.
5. High filtration efficiency .
6. Fast delivery.
7. Size can be customized.
8. Factory manufacturer could contol quality and price.
9. Strict quality inspection and contol.
10. Professional designer team to match with your operating condition.
Description:
Technical Specification:
Fibre | Aramid |
Scrim | Aramid |
Weight(G/M2) | 500~550 |
Thickness (mm) | 2.2 |
Width (mm) | ≤ 2.2 |
Length | 50m/roll |
Finish treatment | Singeing, Calendering, Heat-set,with PTFE membrane,oil&water repellent treatment. |
Air permeability (L/m2/s): | 120~200 |
Tensile strength (N/5× 20cm) | Warp:>900 Weft:>1200 |
Tensile elongation (%): | Warp:<35 Weft:<50 |
Temperature (ºC): | Continue: 204 Instant: 240 |
Anti-acid | Excellent |
Anti-alkali | Excellent |
Anti-abrasion | Excellent |
Producing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:
Exhibization:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) |
||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |
Contact Us at Any Time